Abstract :
The implementation of the Integrated Building Construction Project, SoekarnoHatta Airport, Tangerang Banten was not spared from concrete casting work especially in column casting. This casting job is carried out by direct observation in the field with the assistance of an Assistant Engineer. In this study the authors wanted to analyze the risks that occur in terms of concrete quality. From the results of research to analyze the quality of concrete is to observe concrete casting work, especially in column casting so that the quality of the casting results can be obtained where the quality is damaged or vice versa, then proceed by reducing the damage. It can also be concluded that the risks that occur when casting concrete columns are segregation, shrinkage and bug holes. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara