ANALISIS WAKTU DAN BIAYA PEKERJAAN PEMASANGAN BEKISTING ALUMINIUM FORMWORK PELAT LANTAI DAN BALOK PADA PROYEK MENARA BRI GATOT SUBROTO JAKARTA SELATAN
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
SAN, M Fauzan
Artiani, Gita Puspa
Subject
Teknik Sipil 
Datestamp
2022-10-05 07:42:42 
Abstract :
The development of construction projects in the 4.0 industrial era is increasing, the construction of buildings are not separated from concrete construction works, formwork is a temporary mold used to withstand concrete during concrete in the pouring and in the shape as desired, although it is temporary, but the formwork has a role of pentine in concrete construction work. This BRI Tower project uses 2 formwork namely, conventional and aluminium. The research is being reviewed is the installation of aluminium formwrk in terms of time and cost IN the project Tower of BRI Gatot Subroto ? South Jakarta. The purpose of this research is to know the timing and cost of installation of aluminium formwork plate floor and beam plates divided into 3 zones, zone A, zone B and zone C. Based on the results of the research conducted, obtained the result of the time for the installation of each zone, zone a 8 hours, zone B 7.9 Clock and zone C 8 hours. In terms of the cost of installation of aluminium formwork for each zone obtained result, zone A rp. 115.796.548,-. Zone B rp. 99.271.290,-. Zone C rp. 115.796.548,-. By using this formwork, the total time and cost for installation of aluminium formwork aluminium plate Floor and beam for 1 zone on the 30th floor is 23.9 hours rounded 24 hours to 1 floor. While the total cost for 1 floor Zone 30 is Rp. 330.864.386,-. Aluminium formwork is suitable for typical floor use so that the craftsmanship can be faster and safer. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara