Analisis Koefisien Tenaga Kerja Pekerjaan Beton Bertulang Di Lapangan (Studi Kasus : Proyek MTC Tanah Abang - Jakarta)
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Ningsih, Retno
Sm, Hastanto
Subject
Teknik Sipil 
Datestamp
2022-10-05 04:21:38 
Abstract :
Contractors are more likely to calculate unit of work prices based on their own cost coefficient based on previous experience in completing construction work. Therefore, to find the actual labor coefficient value based on the productivity obtained in the field in order to find the value of the labor unit price coefficient on reinforced concrete work observed based on different analysis. From the data obtained is done productivity calculation and get the labor coefficient value of each reinforced concrete work item in the field is the ironing of the column (foreman : 0.0012 ; head of the handyman : 0.0024 ; handyman : 0.0048 ; worker : 0.0302), beam ironing (foreman : 0.0011 ; head of handyman : 0.0302 ), beam ironing (foreman : 0.0011 ; head of handyman : 0.0302 0022 ; handyman : 0.0034 ; worker : 0.0336), floor plate ironing (foreman : 0.0019 ; head handyman : 0.0037 ; handyman : 0.0296 ; worker : 0.0648), Block formwork (Mandor : 0.0118 ; head handyman : 0,0118 ; Handyman : 0.0354 ; worker : 0.1182) formwork column (foreman : 0.0208 ; head handyman : 0.0208 ; handyman : 0.0624 ; worker : 0.208) floor plate formworker (foreman : 0.0133 ; head handyman : 0.0133 ; handyman : 0.1066 ; worker : 0,0133 3333), Column casting (foreman: 0.0350; head builder : 0.07 ; handyman : 0.14 ; worker : 0.5249), casting blocks and floor plates (foreman : 0.043 ; head handyman : 0.043 ; handyman : 0.3009 ; worker : 0.9597) 
Institution Info

Institut Teknologi Perusahaan Listrik Negara