DETAIL DOCUMENT
PENGOPERASIAN SALURAN 20KV YANG MENGHUBUNGKAN SISTEM KELISTRIKAN KAUREH DENGAN SISTEM KELISTRIKAN PLTA GENYEM 2X10MW UNTUK PENINGKATAN PELAYANAN OPERASI 24 JAM DI PT.PLN ( PERSERO ) ULP GENYEM
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
NIKERBANE, KRISTIN VERONIKA
Erlina, Erlina
Subject
Teknik Elektro 
Datestamp
2022-10-05 03:44:54 
Abstract :
Operation Of A Hydroelectric Power Plant ( Plta ) Is An Operation That Relies On The Potential For Energy And Kinetic And Water To Produce Electrical Energy. Electrik Energy Is Generated And This Is System Commonly Refered To As Hydroelectric,The Four Maincomponents , Namely Reservoisrs And Dams , Overflow Channels ( Water Carriers ). The Central Building ( Poerbouse ) And A Line Of Contact ( Switcyard ) Transmission Units That Supply Electricity Production To Consumers With This Hydroelectriic Power Plant , The Community Or Customers In The Area Enjoy 24 Hour Electricity, So That The Economic And Education System In The Area Becomes Betterc Such As Cities Or Places . Others With A 24 Hour Ignition System So They Can Keep Up With The Times. Before The Operational System Of 24 Hours Of Electricity, This Area Used The Operation Of A Diesel Power Plant Which Turned On For 12 Hours A Day Which Required A Consumption Cost Of 120 Liters Of Fuel Per Day So That It Required Enormous Costs For 4 Months Of This Diesel Power Plant. Safe In The Surounding Environment Which Can Interfere With The Hearing System And Pollution That Has An Impact In The Area And The Economi.System Is Bad. So The Genyem Customer Unit Team Collaborated With PT. PLN PERSERO So That These Regions Can Get 24 Hours Of Electricity So That Their Economic Education System Will Be Better . 
Institution Info

Institut Teknologi Perusahaan Listrik Negara