PERBAIKAN JATUH TEGANGAN PADA JTR GARDU DISTRIBUSIGYM 054 PADA PENYULANG BENYOM JAYA 1 DENGAN METODE GARDU SISIPAN, DI PT. PLN ( PERSERO ) ULP GENYEM, JAYAPURA, PAPUA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Maryen, Rona Maylien
Suwarno, Suwarno
Subject
Teknik Elektro 
Datestamp
2022-10-05 03:40:14 
Abstract :
Installationoftransformator insertisoneoftheparametersfordeterminingthe reliabilityofthe electric power system. As a company that conducts business in the field of electricity. Pt. PLN (persero) ULP genyem seeks to overcome the fall in voltage at the end of jtr caused by more load on the transformer and the distance of the channel / radius of service from the distribution substation that has been installed before. More load on the transformer will cause transformer damage. Thus, it is necessary to try to install the insert transformer to minimize the occurrence of more loads so that the tip voltage does not experience avoltagefall.Reducedvoltagefalling from basetoend is apositive impactofinstallinginserttransformers due to reduced network length. This study aims to determine the repair of falling voltage at the end of JTR by knowing the percentage of bebabn and falling voltage on the transformer during transformer before insertion and transformer after insertion. The data to consider for transformer insertion are transformer load measurement and base voltage measurement with tip. From the calculations obtained that the value of transformer load is less than that 184.6% to 76.4% while the voltage falls at the end of the network from 200-volt to 223 volts. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara