A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionnl5bkr84fmk3pv1smqkg9vb8juiiq4o7): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
PERBAIKAN JATUH TEGANGAN PADA PELANGGAN SAMBUNGAN RUMAH TIPE DERET GARDU JPR 292 PENYULANG GARUDA DI PT.PLN (PERSERO) ULP JAYAPURA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Novesta S.Tukayo, Nolita
Pasra, Nurmiati
Subject
Teknik Elektro 
Datestamp
2022-10-05 03:37:38 
Abstract :
At the time of the electricity voltage distribution process a number of transformation processes must be passed, the end point of the electrician to the consumer is the Home Connection (SR). The quality of the voltage and the level of reliability of the home connection can affect the portrait of the waiter to the consumer. Things that can affect the reliability of the system, one of which is the number of pulls of SR cables that do not meet the standard. Based on data from PT. PLN (Persero) ULP Jayapura and SPLN no.1 in 1995 mentioned that the minimum nominal voltage is -10%. Based on the voltage measurement data received by the customer should not exceed -10% (drop voltage). The result of voltage fall on customers SR Series Substation 292 Garuda Supplier reached 147 volts with the number of pull SR 1.5 to 25 the pull of the presentation fell voltage 37.17% so that the improvement of sr series must be done by adding a larger cross-section and the addition of low voltage network (JTR) so that the voltage channeled in accordance with the standard. After the voltage quality improvement in the customer can be seen that the percentage of voltage drop that was initially the largest was 37.17% and the voltage channeled to the customer decreased to 147 volts, but after the voltage quality improvement, the presentation fell voltage on the customer is 5.48% with the voltage received by the customer is 224 volts. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: