Abstract :
Electricity needs continue to increase where in these conditions the quality of electricity distribution must be maintained so that there is no disruption that can reduce the quality of electricity distribution. The purpose of this study is to determine the 150kV SUTT power loss at the Pagaralam-Lahat substation in June 2020. ACSR 240/40 is a conductor used in combination with steel and aluminum with a resistance value of 0.1183 ohms / km. The results obtained from SUTT with the largest total power reached 0.20551428 MW at 06.00 WIB for the lowest loss at 06.00 WIB which was 0.01816452 MW while for power losses at 18:30 WIB which reached 0.06620292 MW. For the lowest power loss that occurred at 18:30 WIB which reached 0.033777 MW with a total material loss of Rp. 84,754,417