Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Mawardin, Mawardin
Pahiyanti, Novi Gusti
Gifson, Albert
Subject
Teknik Elektro
Datestamp
2022-10-04 04:25:07
Abstract :
The main function of the electric power system is to continuously meet the electrical energy needs of each consumer, often disruptions occur that cause electricity to be cut off, so that electricity does not reach consumers. This can cause losses for PT. PLN (Persero) as a provider of electrical energy and customers as users of electrical energy. Particularly for large customers (customers with power> 200 KVA), the power outage is very influential on their production (business) process, because the continuity of electricity distribution for large consumers is the most important thing. Therefore, to maintain electricity supply to consumers, PT. PLN (Persero) UP3 Bima ULP Sape has a special service, namely premium service. Which aims to determine the work system of four types of premium customers which include platinum, gold, silver and bronze customers and to determine the price rates of these four types. So, the authors conducted an analysis of premium services, the method used in this study is observation and data collection. data on the results of inspection at that location are directly related to the object under study to observe the actual situation in the field. Based on the calculation, it is known that the total cost of electricity consumption for 1 month is Rp. 60,417,061.8, while the results of the electricity bill information from PT PLN (Persero) for 1 month is Rp. 62,235,574. It can be said that there is a difference of Rp. 1,818,512.2