DETAIL DOCUMENT
Koordinasi Relai Gangguan Tanah pada SKTM di Penyulang Debur Gardu Induk Ancol UP3 Bandengan
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
CHAIRANI, TASYA DIANTI
Suwarno, Suwarno
Mowaviq, M. Imbarothur
Subject
Teknik Elektro 
Datestamp
2022-10-04 03:00:27 
Abstract :
The protection system functions as a safety for the electric power system from disturbances that can cause damage to the electricity distribution equipment, one of which is a 1-phase fault to the ground. The protection system in the distribution area is Ground Fault Relay (GFR). Debur area is the electricity service area of PT. PLN (Persero) UP3 Bandengan. In this discussion, the working coordination of the ground connection relay time must be selective, to secure the debtor feeder from disturbances, it is necessary to calculate the short circuit and setting the relay from Circuit Breaker Outgoing Middle Point (CBOMP), Outgoing Feeder and Incoming Feeder. The data obtained by the observation method. From the calculation of the data obtained, the largest single-phase fault current to ground is 929.50 A and the smallest is 708.47 A.By having a delay time of 0.3 seconds on the Circuit Breaker Outgoing Middle Point (CBOMP), 0.7 seconds for the Outgoing Feeder, and 1.1 seconds for the Incoming Feeder 
Institution Info

Institut Teknologi Perusahaan Listrik Negara