Abstract :
Gersik Island is one of the villages in Selat Nasik Subdistrict located in the Belitung Regency. The electrical system in Gersik Island is an isolated system supplied by a diesel power plant. The difficulty of sending diesel fuel to Gersik Island is based on research to combine fossil fuel power plants with solar power plants into a hybrid generating system. Therefore, this study is designed to simulate hybrid generation systems and analyze their feasibility from the technical and economical side using HOMER software. From the simulation results, it is known that the hybrid generating system is feasible to operate from the technical side, with the electricity generated is 268,101 kWh/year. The percentage of loading on this hybrid system is 28.9% of the solar power plant and 71.1% of the diesel power plant. From the economic side, the Net Present Cost of a hybrid generation system is lower than the existing diesel power plant, which is Rp20.708.159.316. The Levelized Cost of Energy of the hybrid generating system is also lower than the existing diesel power plant, which is Rp6.065,90/kWh. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara