Installation of solar power plants starting from September 2019 there have been 1,435 PLTS installations, with details of approximately 800 new PLN consumers since the policy on PLTS was launched in December 2018. solar power plants is a variant of the use of renewable energy made by the government so that the utilization of renewable energy, especially for solar power, continues to increase. This study aims to determine the performance of the EXIM kWh meter system configured in PLTS at the IT-PLN EBT Laboratory, knowing the power used in the load on the Laboratory with the installation of the Configured EXIM kWh Meter on the PLTS, and find out the cost of electricity bills and efficiency with the use of EXIM kWh at the PLN Institute of Technology Laboratory. While quantitative research methods. The results of this study that the production of PLTS power installed in the EBT IT laboratory - PLN, not all of the power produced will be sent or exported to PLN, where some of the power that is not exported will supply the load to the EBT IT laboratory - PLN. On average export power efficiency with power production is 53%. The potential power used in the IT-PLN EBT laboratory load is estimated to be used in a month at 2262.6 kWh. The power that will supply the laboratory load is imported power from PLN and the power production of solar power plants where the average for 7 months is 2003.28. From the data obtained, the average percentage of savings per month in 7 months is about 12%. If the total average power of imports is converted into Rp. 1,423,830 and if the total kWh usage is converted into Rp. 811.157.