Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
FIRDAUS, FAUDI ALFA
Siregar, Riki Ruli A
Susanti, Meilia Nur Indah
Subject
Teknik Informatika
Datestamp
2022-09-22 08:09:29
Abstract :
PT. PLN (Persero) at Cengkareng area from January to April 2018 has
registered 3347 pre-paid kWh damage reports with an average workmanship of
more than 15 working days per disturbance report. Whereas in the operational
standard of workmanship that is 5 working days per disturbance report. In
determination the installation of damage to prepaid kWh in the Cengkareng area,
it didn't yet determine which customers will prioritize the installation first. The
author applies the Tsukamoto fuzzy method to determine which customers would
be prioritized by use 2 variables calles distance and time of report, with this
application the results obtained could facilitate PLN officers in performing
electrical disturbances, so the interference handling could be quickly resolved. In
determination level of accuracy produces a value of 0.98 with very good results