Abstract :
This essay discusses the design of the Mrica Cooperative based data contract
application using the benefit cost ratio method. The application aims to manage
contract data between Cooperative Mrica with employers and able to generate
information about the feasibility of the project. Contract data applications have
features such as managing contracts, managing costs, managing revenue and
benefit cost ratio (BCR) analysis. Benefit Cost Ratio is used to perform an existing
contract data analysis into an information about the advisability of a contract
based on the present value of a contract, the interest rate in the year of
implementation and also the time of contract implementation. Design application
data contract Cooperative Mrica using waterfall method as system designing
software. Then the application tested using ISO / IEC 9126-1, with the test divided
into 6 (six) main characteristics of Functionality, Reliability, Usability, Efficiency,
Portability, Maintainability obtained reliability analysis results of 93.5% of this
system belong to the category very well. So, the design of the Mrica Cooperative
data application can be used to facilitate employees in managing contract data.