Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Bagaskara, Try Okta
Fitriani, Yessy
Kusuma, Dine Tiara
Subject
Teknik Informatika
Datestamp
2022-09-22 02:33:13
Abstract :
Conventional scheduling will certainly take a long time. In addition, there are still
many shift schedules that still clash in the preparation of the schedule. In shift
scheduling the assistant by the laboratory coordinator is required to make a
temporary schedule in advance so that the assistant can arrange the KRS
schedule. If the KRS schedule that has been arranged occurs in conflict with their
shift schedule, then the laboratory coordinator re-arranges the shift schedule per
assistant to the optimum and meets the applicable rules. This study aims to
create a web-based assistant shift scheduling that can be used by the Advance
Computer Laboratory and STT-PLN Jakarta in managing and compiling the data
needed for the assistant shift scheduling process, such as laboratory class
schedules, assistant KRS data, assistant value transcripts, and eyes lectures
registered in the laboratory. In this study, system development was carried out
using the Genetic Algorithm method which included activities for making assistant
shift schedules. Development of this application using PHP and MySQL. Based
on this study, the results obtained are in the form of applications that can make
shift scheduling web-based assistants in order to help manage all data related to
scheduling shift assistants well because the conventional way of making
assistant shift schedules is quite complicated, and can relieve laboratory
coordinators in preparing schedules. shift assistant Advance Computer
Laboratory STT-PLN Jakarta.