In a construction project, the delay of steel material arrival affects the
execution time, therefore, Reinforcing bar material distribution in site become
one of the factors which affect the availability of Reinforcing bar material to be
worked on. At the North Point Navapark Project, the steel material distribution
flow does not yet have time-efficient steps and methods. Soft System Methodology
(SSM) is a method to approach, which can be use to create a steel material
distribution flow model to increase execution time efficiency. actors involvement
will be shown from the steps, which are 1) Problem situation considered
problematic, 2) problem structures, 3) Root definition formulation, 4)
Conceptual Model formulation, 5) Comparison between conceptual model and
reality 6) systematic choices of change and 7) action to improve the problem
situation. With the application of the Soft System Methodology (SSM), a model
of the distribution flow of steel material is formed which is expected to be a
solution for existing problems.