Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Nainggolan, Chesy Brigida
SEPRIYANNA, IRMA
Subject
Teknik Sipil
Datestamp
2022-09-21 07:16:48
Abstract :
Every project is expected to run well and go according to plan. From the preparation stage to the
monitoring stage, quality objectives must always be maintained to avoid deviations from the planned
goals. The purpose of the study, in addition to assessing the level of quality control implementation
in the implementation of flexible pavement work, is also to find out preventive and corrective actions
on the implementation of quality control of flexible pavement work that does not meet the
requirements of the Soekarno-Hatta Airport Accessibility Advanced Project. The method used to
analyze the level of implementation of flexible pavement work quality control, by collecting primary
data and secondary data. The level of implementation of quality control in the implementation of
flexible pavement works is categorized as GOOD with the percentage obtained is 90%. The factors
that can affect the implementation of quality control are equipment factors, soil situation, human
resources, weather, material specifications, material arrivals, temperature checks, work carried out at
night, material laying, compaction work, natural disasters and passing vehicles. In addition,
preventive and corrective actions were also obtained for the implementation of quality control on
flexible pavement work that did not meet the requirements, which were obtained from interviews
with members of the Quality Control and Implementing Division, namely improving coordination
and better communication with related parties. with flexible pavement work, in order to obtain
satisfactory quality and results.