Abstract :
Wijaya Kusuma Village area is one of thedensely populated fathers in west Jakarta, in the
area flows 2 major rivers jakarta flood control namely Kali Angke and Kali Sekretaris. As
a flood controller in Wijaya Kusuma Village there are 2 pump houses, namely Wijaya
Kusuma house and Wijaya Kusuma pump house (ALBAR). To see the capacity of the flood
control pump house to the channel capacity, efficiency is made in the pump house and
drainage channel in order to obtain the appropriate pump discharge. Efficiency is done by
comparing the existing discharge of the pump with the capacity of the channel bin. Using
rational method obtained maximum daily rainfall with a period of 10 years reset is 136.5249
m3 /sec. The result of the calculation of hidraulika channel PHB Wijaya Kusuma obtained
fullbank capacity which channel is 38.4758 m3/s and fullbank capacity of BNI PHB
channel 1.5161 m3/s. Alternative solutions that can be done are by changing the pump
capacity at Wijaya Kusuma Pump House with 1 pump capacity of 0.75 m3/s and Wijaya
Kusuma Pump House with 1 pump capacity of 0.06 m3/sec