EVALUASI KETERLAMBATAN PEMBANGUNAN TOWER TRANSMISI PADA PROYEK SALURAN UDARA TEGANGAN TINGGI (SUTT) 150KV TANGERANG BARU II – INCOMER (BALARAJA – SUVARNA SUTERA)
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
REFNALDI, MUHAMMAD RIFKY
D Siswoyo, Sriyono
Subject
Teknik Sipil 
Datestamp
2022-09-20 03:21:08 
Abstract :
Construction project delay is a condition where there is an increase in construction execution time from the targeted time. In this study, the authors evaluate the delay in the construction of the transmission tower on the 150kV High Voltage Air Line Project (SUTT) Tangerang Baru II ? Incomer (Balaraja ? Suvarna Sutera). In this study the author has the goal of knowing the main factors causing delays in this project. The research method used by the author is the Relative Ranking Index (RRI) method. The RRI method is carried out by ranking the factors that have the highest number of responses so that the factor that gets the highest score is the main factor in the delay in the construction project of the 150kV SUTT transmission tower, Tangerang Baru II - Incomer (Balaraja ? Suvarna Sutera). Of the eleven main factors causing delays, there are 3 main factors that have the most influence on the 150kV Tangerang Baru II ? Incomer SUTT project (Balaraja ? Suvarna Sutera), namely: (1) equipment factor with a weight of 0.613; (2) the situation factor with a weight of 0.493; and (3) managerial factors with a weight of 0.487. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara