DETAIL DOCUMENT
ANALISA PENGGUNAAN JALAN KERJA MENGGUNAKAN ARAMCO DALAM MENINGKATAN KINERJA WAKTU PROYEK (STUDI KASUS : PROYEK JEMBATAN 5 PIK 2 TANGERANG,BANTEN)
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Syaldi, Muh
Putri, Pratiwi Setyaning
Subject
Teknik Sipil 
Datestamp
2022-09-20 04:09:05 
Abstract :
Aramco or better known as corrugated pipe is a work method that is rarely used/practiced during bridge construction and made the author to adopt this work method which aims as learning material when carrying out bridge work. This work method does not take long because the corrugated pipe is ordered directly (no special installation is required) and the soil is used from the rest of the reclamation area. The use of this type of corrugated pipe work method can be the right alternative for construction management. The existence of a project error factor in terms of time makes engineers and project implementers make changes so that the execution time of the work is in accordance with the plan. For corrugated pipe work based on the calculation of work time it takes 7 working days 1 hour. The target time for the 5 PIK 2 bridge work for 9 months 2 weeks with reference to the realization of the work and this corrugated pipe work will affect the erection girder work in realization it takes time 4 days and using aramco for this superstructure work takes 4 working days. In the factors that affect work time, the top 5 rankings are carried out for implementation and impact for bridge projects. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara