ANALISIS PERBANDINGAN RENCANA DAN REALISASI PRODUKTIVITAS FORMTRAVELLER DENGAN METODE BALANCE CANTILEVER BOX GIRDER PADA PROYEK LANJUTAN AKSESIBILITAS BANDARA SOEKARNO-HATTA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
ZAHRINA, NADA
D Siswoyo, Sriyono
Subject
Teknik Sipil 
Datestamp
2022-09-20 04:13:00 
Abstract :
In the construction of the main bridge at the Soekarno-Hatta Airport Accessibility Project using one of the heavy equipment, namely a formtraveller (moving scaffold) using the balanced cantilever method. The purpose of this study is to determine the value of the plan and the realization of productivity and to determine the total time and cost of the realization of the formtraveller work in the construction of the box girder bridge structure with the balance cantilever method. The occurrence of a discrepancy between the productivity of the plan and realization, the authors feel the need to review and analyze in order to find out the comparison of the productivity of the plan and the realization of the use of Formtraveller heavy equipment with the Balance Cantilever box girder Method in the Advanced Accessibility Project of Soekarno-Hatta Airport. Calculation analysis is carried out by calculating the volume of formtraveller work, calculating production capacity, calculating duration and calculating implementation costs so that the total time and cost of realizing formtraveller work obtained for completing the work of 1 box girder segment is 12 days with a total cost of Rp. 208,326,636,- /segment, with the productive value of the formtraveller work plan that is 37.5% and the realized productive value of the formtraveller work that is 16.67%. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara