ANALISIS WAKTU DAN BIAYA PEKERJAAN PILE CAP ANTARA METODE STEEL SHEET PILE (SSP) DAN SODETAN PADA PROYEK JEMBATAN PANTAI INDAH KAPUK 2
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
WULANDARI, NOVI TRI
D Siswoyo, Sriyono
Subject
Teknik Sipil 
Datestamp
2022-09-20 04:14:26 
Abstract :
The implementation of the Bridge 8 project requires a good method so as not to disturb the work and the flow of the Kurus river. Steel Sheet Pile (SSP) is a steel sheet that is used as a retaining wall to clog the soil and prevent water from entering the dug hole. Sodetan is a river diversion method where part or all of the river water in order to change the river flow so as not to interfere with the construction process. The plan for making Sodetan aims to facilitate the process of mobilizing heavy equipment without disturbing the water flow of the Kurus river. This study aims to analyze the comparison of the SSP method and the river Sodetan method, in order to obtain a method that can be applied effectively and efficiently. From the calculation analysis, it was found that the comparison of the time of the SSP method only requires 77 days, while the Sodetan method takes 83 days, so that the SSP method is 6 days faster than the Sodetan method. In terms of cost, the SSP method costs Rp 3,694,686,438.40 while the Sodetan method only costs Rp 237.285.069,19, which means that the Sodetan method is more efficient at Rp 3.457.401.369 than the SSP method. After being reviewed in terms of time and cost, the SSP method is faster to spell. However, in terms of cost, the Sodetan method is more efficient. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara