Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
IKHSAN, PUTRA MUHAMAD
Wirantina K, Irma
Subject
Teknik Sipil
Datestamp
2022-09-20 04:16:12
Abstract :
Risks are things that may occur naturally or the possibility of unexpected events
being a threat to construction projects in the implementation of the construction
of the Soekarno-Hatta Airport Accessibility Advanced Project where delays
occur. The purpose of this study is to identify risk factors that affect time
performance, the causes and impacts of dominant risks and what actions and
responses are applied to these risk factors in order to minimize delays. In this
study, descriptive quantitative methods were used where data collection was
carried out by means of surveys through questionnaires and validated by experts
for variable determination, questionnaire distribution, validity and reliability
testing with SPSS v.26, ranking test analysis and risk level with Ms. Excel and
interviews with respondents for follow-up analysis. The results show that there
are 10 types of dominant risk factors that have a high to moderate category,
namely late payments by the owner, Availability of Funds, Changes in design
during the construction process, High rainfall, Delays in material delivery,
Increased costs due to stakeholder barriers to approval steps for overcome
project risks, delays in payments to suppliers, delays in payment of terms, lack
of attention and application of OHS aspects in the field, delays due to the length
of time the decision is taken or the approval of the required acceleration steps.