DETAIL DOCUMENT
PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) OFF GRID DI MADAMNUM PATISSERIE BAKERY SHOP BANDA ACEH
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Hidayatullah, Regi Reynaldi
Hidayat, Syarif
Subject
Teknik Elektro 
Datestamp
2022-09-20 03:57:48 
Abstract :
As a tropical country, several studies on solar power plants have been developed. So far, a research study on planning a solar power plant at the Madamnum Patisserie Bakery Shop Banda Aceh has never been carried out. In fact, the planning of solar power plants is beneficial in terms of positive energy for human resources because solar power is clean and environmentally friendly energy. The planning of the off-grid solar power plant (PLTS) at the Madamnum Patisserie Bakery Shop Banda Aceh is carried out based on the power requirements of the bakery shop which is used as a research site. Solar energy as a renewable energy is very suitable to be used as an alternative energy for use in places such as the Madamnum Patisserie Bakery Shop Banda Aceh. In this planning, quantitative methods are used because this research is carried out using calculating system. This solar power plant planning requires a total cost of Rp. 474.930.913, - and a load of 55,366 kWh. It takes 50 solar modules with specifications of 300 WP, 68 batteries with specifications of 12 Volt 200 Ah, 1 solar charge controllers with specifications of 500 Vdc 100 A, 1 inverter with specifications of 5 kW, and 1 combiner box with specifications that can accommodate a maximum of 24 strings. The Performance Ratio (PR) in this off-grid solar power plant planning is 85% and the return on capital occurs in the 13th year of the project's life of 20 years so that this plan is feasible to carry out 
Institution Info

Institut Teknologi Perusahaan Listrik Negara