Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Saragih, Zyang Ardani
Yogianto, Agus
Subject
Teknik Elektro
Datestamp
2019-10-10 09:45:43
Abstract :
With tropical climate conditions that get sunlight throughout the year, Indonesia has insulated solar energy to an average of 4.8 kWh / m2, so Indonesia has proven to produce electricity through a Solar Power Plant (PLTS). With the Indonesian Government Program which always encourages the use of Renewable Energy (EBT), so it operates PLTS Gili Air 161.28 kWp and Gili Meno 60.48 kWp in North Lombok Regency. By operating it is necessary to analyze its efficiency both in terms of components and system efficiency, these results will be used as a reference for the construction of new PLTS in various parts of Indonesia. The most efficient PV array when operating in sunny and cloudy weather is PV array 1 PLTS Gili Air. All inverters operating on Gili Air and Gili Meno PLTS are still working optimally where the average efficiency is 92-95% for sunny weather and 85-90% for cloudy weather. Efficiency of Gili Air PLTS system on sunny weather was 11.58% and 8.56% in cloudy weather while Gili Meno PLTS system efficiency in sunny weather was 10.73% and 8.54% in cloudy weather, with the advantage of the second installed PLTS Rp 34,198 .575,00