Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sara, Yohanes Carlos Ngaga
Hajar, Ibnu
Subject
Teknik Elektro
Datestamp
2022-09-20 03:29:54
Abstract :
PLTS converts electromagnetic energy from sunlight into electrical energy. On-Grid PLTS planning at the Civil Service Police Office of Ende Regency generates 7 kWp of power, with 35 panels used, each with a capacity of 200 Wp. The triangular roof area is 44m2. The inverter used is 1 unit with a capacity of 4 kW. The purpose of this study is to reduce the use of conventional PLN energy to meet energy needs at the Civil Service Police Station, Ende Regency. This plan requires a cost of Rp. 130.935.000. From the average daily load requirement of 35302 W/h, this plan produces 34450 W/h to meet 97% of the needs of the Ende District Civil Service Police Station