Operation of the power distribution system become part of the operating system the electric power is the most close to the load. The voltage at each load point along the channel should meet the standard of voltage. In accordance with SPLN 01 :1995 voltage for the distribution system are restricted, namely +5% and -10% of nominal voltage. At Feeders Herlina happen to fall in voltage that exceeds the standard, i.e. by 25.8% of the nominal voltage. In this thesis to overcome the voltage drop on the Feeders Herlina done broken load and installation of capacitors. Simulation using software and the results obtained after the rupture load of the voltage drop across the Feeder Herlina by 14.3% from the nominal voltage. After the addition of 2x400 kVar capacitors on the Feeders Herlina obtained by the voltage drop of 9.8% from the nominal voltage.