ANALISIS FAKTOR FAKTOR PENYEBAB KETERLAMBATAN SERTA LANGKAH LANGKAH PREVENTIF DALAM MEMINIMALISIR KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG PENYIMPANAN BENDA SITAAN DAN BARANG RAMPASAN KPK
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
ARIF, TRI SETIAWAN
Kustanrika, Irma Wirantina
Subject
Teknik Sipil 
Datestamp
2022-09-20 03:16:39 
Abstract :
In work planning, operational problems often arise that hinder the completion of a project such as lack of resources, inappropriate allocation of resources, delays in project implementation and other problems outside the schedule in the work plan. Likewise, what happened to the Construction Project for the Storage of Confiscated Goods and Loot Buildings, the KPK experienced problems in its operations. Project delays can come from service providers or from service users or other parties. Therefore, this thesis aims to analyze the factors causing delays in the completion of the construction project for the storage building for confiscated objects and looted goods by the KPK. The method used in analyzing the problem in this project is the House of Risk which functions to analyze the data causing delays. From the results of five delay events, nineteen causes of delays were found which were then sought for the Potential Aggregate Delay (ADP) value to determine the three main problems that caused delays in this project. Based on the analysis using the House of Risk (HOR) method, it was found that the three main causes of delays in the construction of the KPK confiscated and looted storage building were the lack of human resources, sub-optimal productivity from contractors and changing images. These three problems can be minimized by adding human resources, doing good communication and coordination, making procedures for making and changing images, making a comprehensive check list. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara