DETAIL DOCUMENT
ANALISA SELISIH HARGA SATUAN PEKERJAANPENGECORAN PILE CAP ANTARA METODE AKTUAL DAN SNI PROYEK PEMBANGUNAN SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 kV TELUK NAGA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
FADHLURRAHMAN, MUH FIKRI
D Siswoyo, Sriyono
Subject
Teknik Sipil 
Datestamp
2022-09-20 01:34:35 
Abstract :
The final project entitled "Analysis of the Difference in Unit Price of Pile Cap Casting Work Units Between the Actual Method and SNI for the 150 kV High Voltage Airway Construction Project in Teluk Naga" aims to determine the price of pile cap casting work every 1m3between the actual conditions in the field and SNI which is an analysis Work Unit Prices which have been stated in the PUPR Ministerial Regulation No. 28 of 2016. The data collection method used is direct observation in the field, collecting daily work report data and unit price data, then the results will be compared with comparative analysis. The results obtained in this study are the unit price of pile cap casting work every 1 m3 on the construction project of the 150 kV high voltage overhead line Teluk Naga with the actual method is 1,304,076.97 rupiah, while using SNI is 1,550,644.20 rupiah. . The percentage difference is that the actual method is 15.90% cheaper than SNI, or the difference is 246,567.23 rupiahs. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara