Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Kahfi, Alwi
Hutadjulu, Albert Gifson
Subject
Teknik Elektro
Datestamp
2022-10-28 01:21:51
Abstract :
The assessment method is an activity to measure the condition of the medium voltage cable line which includes a measurement of cable length, partial discharge, monitoring withstand test, cable tracer and analyzing the results and providing recommendations for actions to make repairs - repairs and maintenance needed on the medium voltage cable line segment carried out an assessment. In the implementation of the assessment method from year to year, the increase in overcoming the interference of medium voltage cable lines is increasingly controlled, where a follow-up is continued to be carried out to achieve that the distribution of electric power runs well as it should. From the calculations carried out indapat the energy that was not distributed due to the occurrence of a disturbance during 2019 was calculated at 3,003,434,208 kWh. For undistributed energy per customer, it is obtained at 906,834 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2019 is Rp. 1,467.28 / kWh. Where the loss obtained due to interference with medium voltage cable lines in 2019 was Rp. 618.03 / kWh. a disturbance during the year 2020 amounted to 12,541,740,192 kWh. For non-channeled energy per customer, it is obtained at 1,853,094 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2020 is Rp. 1,444.70 / kWh. Where the loss obtained due to interference with medium voltage cable lines in 2020 was Rp. 1,282.68 / kWh. Thedisturbance during 2021 was 1,152,899,784 kWh. For undistributed energy per customer, it is obtained at 561,841 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2021 is Rp. 1,444.70 / kWh. Where the loss obtained due to interference in medium voltage cable lines in 2021 is Rp. 388.89 / kWh.