Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Okke Siswanto, Welly
Tresya Mauriraya, Kartika
Subject
Teknik Elektro
Datestamp
2022-10-31 04:04:39
Abstract :
Along with the increasing number of consumers using electricity in the work area of ULP
Lemah Abang, especially in the lychee feeder, one of the distribution transformers,
namely the PGCE transformer, is overloaded. Overcoming the overloaded transformer
is by looking for additional substations and load breakage, distribution transformer
substations with SNTR code. Researchers conducted a quantitative analysis of
correlation. The quality of power distributed to customers properly in accordance with
applicable standards in order to minimize or prevent damage. Parameters used to
measure power quality are loading current, load imbalance, loading power and voltage
drop. Before repairing the loading current 109% - 117%, load imbalance 2% - 4%,
loading power 110%-118% and voltage drop 6% - 7%. After repairs are made to the
PGCE transformer, the load current is 76% - 77%, load imbalance is 2% - 4%, loading
power is 75% - 76%, voltage drop is 4% - 5%. And the addition of the SNTR substation
loading current 64% - 66%, load imbalance 6% - 9%, loading power 63% - 65%, voltage
drop 3% - 4%. So the conclusion is that after the insertion of the substation, the loading
is in accordance with the 1995 SPLN and SE No. 0017.E/DIR/2014, which is below 80%.