EVALUASI DAN ANALISIS ENERGI LISTIK PADA PEMAKAIAN SENDIRI UNTUK PROSES PRODUKSI DAN RUGI-RUGI PADA PLTGU BLOK 1 UP MUARA KARANG
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
INSYIRAH ELITA YOLANDARA, ANNISA
Afrianda, Rio
Subject
Teknik Elektro 
Datestamp
2022-10-31 06:56:44 
Abstract :
The power plant has an obligation to produce electrical energy for the needs of the community. In the production process, the generator must use electrical energy to operate the equipment, so that the generator has its own consumption load to meet the needs. As the party that produces and uses electrical energy, the generator and PLN make an agreement that the generator can use a maximum of 5% of the total energy produced. One of the major energy contributors in its own use is production equipment which from processing data from January to around four million kWh every month. The price depends on the electrical energy produced, the greater the energy produced, the greater the use itself. In addition, the generator also loses power from the production process as well as from transmission to the GI. The losses generated from January to May on the cable are spread around 1,195 kWh. To reduce cable losses, the distance between the generator and the GI is built close. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara