DETAIL DOCUMENT
PERANCANGAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) BERBASIS OFF-GRID PADA SEBUAH RUMAH DI KOMPLEK PONDOK PERMATA KABUPATEN BANJAR
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
REZKY KUSUMA RAMADHAN, MUHAMMAD
Makkulau, Andi
Subject
Teknik Elektro 
Datestamp
2022-10-31 08:40:36 
Abstract :
Borneo is an area passed directly by the equator, where in this area the Sun is right above the human head at noon. Currently, the fulfillment of electricity needs is based on the origin of the energy source of steam power plants or limited coal energy, so the use of electrical power from renewable energy is another option that must even continue to be developed in the future. In this study, technical and economical analysis methods are used to plan the PLTS system as a source of electrical energy in office buildings. This PLTS is designed to supply electricity with an estimated daily energy load of around 16,790 kWh. In planning this OffGrid PLTS, 16 solar panels are assembled. The components needed in this plan are 1 SCC, 18 batteries and 1. . Based on PVSyst Performance Ratio (PR) Software in the SOLAR system as a reference that this system is feasible to be realized with a PR value of 74.68%, while based on manual calculation performance ratio (PR) of 85%. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara