OPTIMASI KOMBINASI PENGGUNAAN ALAT BERAT
DITINJAU DARI WAKTU DAN BIAYA PADA
PEKERJAAN GALIAN DAN TIMBUNAN (STUDI KASUS: PADA PROYEK PEMBANGUNAN JALAN MARABAHAN-MARGASARI KABUPATEN BARITO KUALA PROPINSI KALIMANTAN SELATAN) Total View This Week0
Institusion
Institut Teknologi Nasional Malang
Author
SETIA, BAKTI
Subject
Civil Engineering
Datestamp
2023-05-19 02:36:39
Abstract :
OPTIMASI KOMBINASI PENGGUNAAN ALAT BERAT
DITINJAU DARI WAKTU DAN BIAYA PADA
PEKERJAAN GALIAN DAN TIMBUNAN (STUDI KASUS: PADA PROYEK PEMBANGUNAN JALAN MARABAHAN-MARGASARI KABUPATEN BARITO KUALA PROPINSI KALIMANTAN SELATAN)