A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionovfd6c0bm11oij4t2m6po1lt725se1rl): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
PRA RENCANA PABRIK ALUMINIUM SULFAT DARI BAUKSIT DENGAN PROSES DORR KAPASITAS PRODUKSI 80.000 TON/TAHUN PERANCANGAN ALAT UTAMA REAKTOR
Total View This Week0
Institusion
Institut Teknologi Nasional Malang
Author
MUALIMIN, JIM
Subject
Chemical Engineering 
Datestamp
2022-01-18 01:19:52 
Abstract :
Pra Rencana Pabrik Alumunium Sulfat dari bauksit dengan proses Dorr ini mengambil lokasi pendirian kawasan industri Mitra Karawang di Karawang, Jawa Barat dengan kriteria sebagai berikut: - Kapasitas Produksi : 80.000 ton/tahun - Waktu operasi : 330 hari/tahun - Bahan utama : Bauksit - Utilitas : Air, Steam, Listrik, dan Bahan Bakar - Organisasi Perusahaan ? Bentuk : Perseroan Terbatas ? Struktur : Garis dan Staff ? Karyawan : 176 orang - Analisa ekonomi ? TCI : Rp347.397.986.770,21 ? ROIAT : 25,01% ? POT : 3 tahun ? BEP : 40% ? IRR : 21,19% Dari hasil evaluasi ekonomi. Pra Rencana Pabrik Alumunium Sulfat dari bauksit dengan proses Dorr ini layak untuk didirikan. 
Institution Info

Institut Teknologi Nasional Malang

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: