A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionv6trjkercj09sbv3ide9ejc63ncqogf4): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
ANALISIS CASH FLOW DI PROYEK PENINGKATAN JALAN LINGKUNGAN BANJARMASIN TENGAH PAKET 1
Total View This Week0
Institusion
Universitas Islam Kalimantan M A B Banjarmasin
Author
Rahim, Aulia
Subject
TA Engineering (General). Civil engineering (General) 
Datestamp
2021-04-05 03:57:54 
Abstract :
Pelaksanaan proyek konstruksi memerlukan banyak sumber daya diantaranya adalah peralatan, tenaga kerja, material, dan finansial. Finansial yang baik diperoleh melalui perencanaan cash flow optimal. Pemilihan sistem pembayaran yang tepat dapat memberikan keuntungan maksimum bagi kontraktor. Tujuannya adalah untuk mengetahui sistem pembayaran yang baik, besar keuntungan dan faktor-faktor yang mempengaruhi cash flow, maka dilakukan penelitian pada Proyek Peningkatan Jalan Lingkungan Kecamatan Banjarmasin Tengah Paket 1. Metode yang digunakan yaitu Membuat diagram jaringan proyek dengan PDM dengan menggunakan bantuan software Microsoft Project. Kemudian dilakukan perhitungan cash flow dengan beberapa sistem pembayaran yaitu pembayaran bulanan dan pembayaran termin tanpa uang muka dan dengan uang muka 20%, 25% dan 30%. Dari hasil perhitungan dapat diketahui Cash flow proyek yang paling optimal yang dapat memberikan profit yang paling besar bagi kontraktor dan faktor-faktor yang mempengaruhi cash flow pada proyek. Hasil analisis data menghasilkan bahwa pada proyek Peningkatan Jalan Lingkungan Kecamatan Banjarmasin Tengah Paket 1 dengan sistem pembayaran bulanan dengan uang muka 30% menghasilkan keuntungan profit sebesar 9,842% dari nilai kontrak. Sedangkan sistem pembayaran yang memberikan profit maksimum adalah sistem pembayaran termin dengan uang muka 30% pada kondisi Geser menghasilkan profit sebesar 9,855% dari nilai kontrak. The Implementation of the construction projects requires a lot of resources including equipment, labor, materials, and finance. A good financials are obtained through optimal cash flow planning. Choosing the right payment system can provide maximum profit for the contractor. The purpose is to find out a good payment system, the amount of profit and the factors that affect cash flow, so the study was at The Environmental Road Improvement Project In Central Banjarmasin District Package 1. The method used is to make a project network diagram with PDM using the help of Microsoft Project 2010 software. Then the cash flow calculation with several payment systems are monthly payments and payments progress without down payment and with down payments of 20%, 25% and 30%. From the calculation results, it can be seen that the most optimal project cash flow can provide maximum profit for the contractor and the factors that affect cash flow in the project. The results of the data analysis in the Environmental Road Improvement Project In Central Banjarmasin District Package 1 with a monthly payment system with a down payment of 30% resulting 9.842% profit of the contract value. Meanwhile the payment system that provides maximum profit is the payment progress system with a down payment of 30% on the slide condition resulting 9,855% profit of the contract value. 
Institution Info

Universitas Islam Kalimantan M A B Banjarmasin

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: