DETAIL DOCUMENT
ANALISIS DAYA DUKUNG PONDASI BORE PILE BERDASARKAN DATA SONDIR PADA PROYEK PEMBANGUNAN INSTALASI IBU KOTA KECAMATAN (IKK) PERUSAHAAN DAERAH AIR MINUM (PDAM) KABUPATEN TANAH LAUT
Total View This Week0
Institusion
Universitas Islam Kalimantan M A B Banjarmasin
Author
Al Hakim, Firman
Subject
TA Engineering (General). Civil engineering (General) 
Datestamp
2021-04-19 02:17:40 
Abstract :
Pekerjaan penyelidikan geoteknik dan mekanika tanah merupakan salah satu pekerjaan yang menghasilkan data - data penunjang dalam pekerjaan perencanaan suatu bangunan. Didalam kegiatan perencanaan, penyelidikan geoteknik dan mekanika tanah harus dilakukan secara baik sehingga dihasilkan gambaran yang jelas mengenai index properties dan engineering properties dari tanah. Analisis geoteknik dilakukan untuk dapat mengetahui stabilitas dan daya dukung tanah dalam menerima beban struktur diatasnya, termasuk di dalamnya mengidentifikasi perilaku dan sifat teknis tanah sebelum pembangunan juga memprediksi perubahan perilaku dan sifat teknis tanah setelah pembangunan. Untuk mengetahui struktur tanah dan daya dukung tanah di lokasi perencanaan proyek pembangunan Instalasi Ibu Kota Kecamatan (IKK) Pelaihari Perusahaan Daerah Air Minum Kabupaten Tanah Laut maka dilakukan analisis perhitungan daya dukung tanah menggunakan data sondir dari dua titik sondir dengan menggunakan tiga metode yaitu metode Van Der Ween, metode Philipponant, dan metode Mayerhoff. Berdasarkan hasil perhitungan nilai daya dukung pondasi bore pile dengan menggunakan tiga metode dihasilkan nilai daya dukung yang berbeda ? beda. Untuk perhitungan menggunakan metode Van Der Ween hasil nilai daya dukung ultimit (Qult) 213.20 ton dengan daya dukung izin (Qizin) 71.06 ton untuk titik sondir S.02 dan 193.52 ton dengan daya dukung izin (Qizin) 64,50 ton untuk titik sondir S.03. Perhitungan menggunakan metode Philipponant hasil nilai daya dukung ultimit (Qult) 136.51 ton dengan daya dukung izin (Qizin) 45,50 ton untuk titik sondir S.02 dan 135, 06 ton dengan daya dukung izin (Qizin) 45,02 ton untuk titik sondir S.03. Dan untuk perhitungan metode Mayerhoff hasil nilai daya dukung ultimit (Qult) 654.37 ton dengan daya dukung izin (Qizin) 218,12 ton untuk titik sondir S.02 dan 702.73 ton dengan daya dukung izin (Qizin) 234,24 ton untuk titik sondir S.03. Geotechnical investigation work and soil mechanics is one of the jobs that produces supporting data in planning a building work. In planning activities, geotechnical and soil mechanics investigations must be carried out properly so as to produce a clear picture of the index property and engineering properties of the soil. Geotechnical analysis is carried out to be able to see the stability and bearing capacity of the soil in accepting structural loads above it, including the behavioral identity and technical properties of the soil before construction as well as predicting changes in behavior and technical properties of the soil after construction. To see the structure of the soil and the carrying capacity of the soil at the location of the Pelaihari Regional Capital City Water Supply Company (IKK) development project in Tanah Laut Regency, an analysis of the calculation of the carrying capacity of the soil was carried out using sondir data from two sondir points using three methods, namely the Van Der method. Ween, the Philipponant method, and the Mayerhoff method. Based on the calculation of the bearing capacity value of the bore pile foundation using three methods, the resulting bearing capacity values are different. To calculate using the Van Der Ween method the results of the ultimate carrying capacity (Qult) 213.20 tonnes with the carrying capacity of the permit (Qizin) 71.06 tonnes for sondir points S.02 and 193.52 tonnes with permit carrying capacity (Qizin) 64, 50 tons for the sondir point S 0.03. The calculation using the Philipponant method results in the ultimate carrying capacity (Qult) of 136.51 tonnes with the carrying capacity of the permit (Qizin) 45.50 tonnes for the sondir point S.02 and 135.06 tonnes with the permit carrying capacity (Qizin) of 45.02 tonnes for the sondir point S.03. And for the calculation of the Mayerhoff method the results of the ultimate carrying capacity (Qult) of 654.37 tonnes with the carrying capacity of the permit (Qizin) 218.12 tonnes for sondir points S.02 and 702.73 tonnes with permit carrying capacity (Qizin) 234.24 tonnes for the sondir point S 0.03. 
Institution Info

Universitas Islam Kalimantan M A B Banjarmasin