ANALISIS KOEFISIEN KEBUTUHAN MATERIAL DAN TENAGA DENGAN METODE ANALISIS BURGERLIJKE OPENBARE WERKEN (BOW) DAN METODE ANALISIS SNI 2008 TERHADAP EFISIENSI ALUR PENGADAAN MATERIAL DI PROYEK (Studi Kasus : Bangunan Tenant-150, Project Awann Costa POJ, Semara Total View This Week0
Institusion
Universitas PGRI Semarang
Author
Octaviana, Luthfia Dea
Subject
TA Engineering (General). Civil engineering (General)