Abstract :
PT.Rangka Kingdom is a company engaged in the stockist and trading all kinds of iron
for both infrastructure and manufacturing. With distribution channels in almost all of
Indonesia, PT. Framework Kingdom supports the industry through product development
and concrete iron, wiremesh, steel pipe and profile.
PT.Rangka Kingdom engaged in trading and stockist already has the structure of
performance measurement, but the measurement of supply chain performance has not
coordinated and not well enough integrated with the existing network between the
company's supply chain as fulfilling consumer demand constraints that sometimes not in
accordance with the requests or orders, purchasing less rapidly in the supply of
materials, machine jams / damaged so that the distribution process is less constrained
and can estimate the purchasing party products that will be a lot of consumer demand
resulting in prolonged accumulation of stock in the warehouse, so the concept of supply
chain within the company unstable. It makes the imbalance between demand and supply
of materials in the company.
Supply Chain Management is a solution that is more suitable and in accordance with the
conditions and objectives. To determine the performance of the company with a supply
chain requires a measurement approach is model Supply Chain Operations Reference
(SCOR). With hope PT.Rangka Kingdom to maintain the balance of existing supply chain
management, to plan, source, deliver, return to work well,
From the measurement results PT performasi supply chain framework Kingdom it is
known that the value of supply chain performance in the PT framework Kingdom in May
2011 until April 2012 considered adequate because the resulting value of SCOR
performasi 60.21. And the average - average yield performance of supply chain
aggregation 65.11 (enough).
From the results of the research may also know the value of each KPI are as follows:
Forecast Accuracy (62.28); Planning Employee Reliability (62.50); Internal Relationship
(85.41); Source Employee Reliability (62.49); Supplier Delivery Lead Time (91.38);
Material Order Cost (61.1); Payment Term (49.61); Delivery Lead Time (92.77);
Minimum Delivery Quantity (14.05), Number of Customer Complaint ( 38.33), Customer
Satisfaction (62.49). From these values it can be seen that there is a KPI that has a low
score that needs to be done revamping the priorities that have a value below 50 points
Material Payment Term (27.38) ; Minimum delivery Quantity (14.05) and the Number of
Customer Complain (38.33).
Keywords: Supply Chain, Supply Chain Operations Reference (SCOR).