A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessione5df0rjgohva3lm5v5h8tm7dm8qbq444): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
Implementasi Pembangkit Listrik Tenaga Gelombang Laut Sistem Pelampung Pada Kelong
Total View This Week0
Institusion
Universitas Maritim Raja Ali Haji
Author
Rizky Abiyoga, Putra
Tonny, Suhendra
Anton Hekso, Yunianto
Subject
620.006 Management of Engineering/Manajemen Teknik 
Datestamp
2021-07-25 13:00:45 
Abstract :
Potensi gelombang laut yang terdapat tepatnya di kawasan Berakit dapat dimanfaatkan sebagai energi listrik dengan skala kecil. Berdasarkan hasil penelitian, pembangkit listrik tenaga gelombang mampu digerakkan oleh gelombang laut dengan tinggi rata? rata 6 cm, dan mengahsilkan tegangan 1,69 V, secara kontinyu tegangan tidak selalu stabil. Puncak maksimal tegangan output didapat hingga 15 VDC, setelah mengetahui hasil pengujian pembangkit listrik dapat mensupllai sebagai charger untuk baterai aki di kelong sebesar 0,963 VDC dengan tegangan aki sebesar 11,36 VDC. 
Institution Info

Universitas Maritim Raja Ali Haji

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: