Pengaruh Pasang Surut Terhadap Sistem Tambat Kapal Ore Carrier 35.000 Dwt - Studi Kasus Proyek Pelabuhan Pertambangan Milik PT. Gorontalo Minerals
Total View This Week0
Institusion
Institut Teknologi Sepuluh Nopember
Author
Silalahi, Haris Raymond
Subject
V220 Naval ports, bases, reservations, docks, etc. 
Datestamp
2023-07-18 02:04:01 
Abstract :
Provinsi Gorontalo memiliki luas wilayah sebesar 11.257 km2 dan memiliki potensi sumberdaya geologi dengan ditemukannya kandungan tembaga porfiri dan emas. Potensi tersebut akan dimanfaatkan oleh PT. Gorontalo Minerals, sehingga perusahaan perlu rencana pembangunan pelabuhan pertambangan (mining port) untuk memudahkan akses logistik pertambangan. Proses pembangunan tahap pertama dilakukan dalam rentang tahun 2026-2035 dengan target produksi sebesar 25.000 ton per bulan. Pelabuhan pertambangan (mining port) tersebut akan melayani sekitar 25.000 ton barang curah kering (dry bulk) menggunakan kapal ore carrier 35.000 DWT dengan frekuensi pengiriman sekali per bulan. Pelabuhan tersebut memiliki jetty dengan ukuran panjang 250 m dan lebar 20 m, sedangkan kedalaman dermaga sekitar -30 m LWS. Perencanaan sistem tambat kapal ore carrier dibutuhkan untuk mengakomodasi kegiatan bongkar muat di dermaga. Perencanaan sistem tambat akan disesuaikan dengan ketentuan ?BS 6349-4:2014? yang dipublikasikan oleh BSI (British Standards Institution), sedangkan konfigurasi tali tambat akan disesuaikan dengan ketentuan ?MarCom WG24: Criteria for Movements of Moored Ships in Harbours - A Practical Guide? yang dipublikasikan oleh PIANC. Analisis terhadap perubahan gaya tarik tali tambat akibat pasang surut dan gerakan kapal selama kegiatan bongkar muat akan disimulasikan dengan bantuan software ?Orcaflex?. ================================================================================================================================== Gorontalo Province spans an area of 11,257 km2 and possesses significant geological resources, including recently discovered porphyry copper and gold deposits. To effectively utilize these resources, PT. Gorontalo Minerals is undertaking a mining port development initiative to enhance mining logistics accessibility. The initial phase of this development is scheduled for implementation between 2026 and 2035, with a target production rate of 25,000 tons per month. The mining port is designed to handle approximately 25,000 tons of dry bulk goods, utilizing an ore carrier vessel with a capacity of up to 35,000 DWT for monthly shipments. The mining port features a jetty that measures 250 meters in length and 20 meters in width. Furthermore, the anchorage depth is estimated to be around -30 meters LWS (Low Water Springs). In order to accommodate the loading and unloading operations of an ore carrier vessel, it is necessary to establish a jetty mooring system. The jetty layout adheres to the specifications outlined in "BS 6349 4:2014" published by BSI (British Standards Institution), while the mooring line configuration complies with the guidelines provided in "MarCom WG24: Criteria for Movements of Moored Ships in Harbors - A Practical Guide" published by PIANC. Differences in mooring line tension due to sea tides effect along with dynamic ship motion during loading and unloading operation will be analyzed using Orcaflex. 
Institution Info

Institut Teknologi Sepuluh Nopember