DETAIL DOCUMENT
Analisis Perbandingan Volume Pekerjaan Struktur Menggunakan Tekla Structures Dengan Metode Konvensional Pada Proyek Pembangunan Gedung PASTORAN SANTO PAULUS SINGARAJA
Total View This Week0
Institusion
Politeknik Negeri Bali
Author
Sthanu, I Putu Gede Bagus Luhur Swambhara
Suasira, I Wayan
Suparta, I Wayan
Subject
Ilmu Teknik 
Datestamp
2022-10-30 00:00:47 
Abstract :
The calculation of the volume of work is one of the critical points in preparing a budget plan, both in the planning stage and the implementation stage. The miscalculation of the volume of work will be fatal due to the discrepancy of the volume of the calculation of work with the realized volume in the field. Errors at the time of calculation can occur from for example: arithmetic errors, namely addition, multiplication, division, and comma number format. [4]. The current development of construction is not only in sophisticated implementation tools, in terms of supporting applications it has also experienced significant developments, this development is the presence of BIM (Building Information Modelling). BIM is an application method that supports the entire design phase, allowing for better analysis and control of manual processes. Upon completion, the created model will contain the geometry and accurate data needed to support construction, fabrication, and procurement activities in order to realize the building [5]. So that the above mistakes can be prevented. From the results of the analysis and discussion, the difference in volume in pile work was obtained, which was 1%, in concrete work it was obtained 4.21%, and in the finishing work it was obtained 10.02%. 
Institution Info

Politeknik Negeri Bali