Institusion
Politeknik Negeri Bali
Author
Diva, Anak Agung Gde Ngurah Rama
Sudiasa, I Wayan
Ramia, I Nyoman
Subject
Ilmu Teknik
Datestamp
2022-10-29 06:36:36
Abstract :
In every building construction work, it will not be separated from one of its main components,
namely materials. The availability of materials as an important component in a construction project
has a relationship with the project cost budget. So that indirectly plays an important role in
supporting the success of the project. However, in every implementation of a building construction
project, the appearance of leftover materials will be inevitable.
In the construction project of the ASPOL SANGLAH Flat Building, there are many leftover materials
in the implementation of construction that have an impact on the project itself. This research aims
to analyse the dominant material waste by using Pareto diagram, and to find out the causes of
material waste by using fault tree analysis (FTA).
From the calculation of the Pareto diagram, the dominant construction material waste is obtained,
namely cement, screw iron, ready mix k-350, terracotta 30x60 ceramics, interior wall paint. The
factors that cause material waste are human factors, measurement factors, and management factors.
Keywords: Material Waste, Pareto, Fault Tree Analysis,Flat building