Abstract :
Tujuan Penelitian ini adalah; 1. Untuk mendapatkan gambaran Peluang risiko yang di
hadapi pelaku usaha batu bata merah dalam melaksanakan proses produksi; 2. Untuk
mendapatkan gambaran dampak risiko yang di hadapi pelaku usaha batu bata merah
dalam melaksanakan proses produksi; dan 3. Untuk mendapatkan gambaran manajemen
risiko pada pelaku usaha batu bata merah dalam melaksanakan proses produksi.
Sedangkan permasalahan penelitian ini meliputi: 1. Kemungkinan Peluang risiko apa
yang di hadapi pelaku usaha batu bata merah dalam melaksanakan proses produksi; 2.
Apa saja Dampak risiko yang di hadapi pelaku usaha batu bata merah dalam
melaksanakan proses produksi; dan 3. Apa saja manajemen risiko pada pelaku usaha
batu bata merah dalam melaksanakan proses produksi.
Penelitian ini menggunakan metode risk assessment kualitatif. Sumber data
berupa primary data melalui kuesioner secara wawancara mendalam (deep interview)
dengan keyinforman. Juga menggunakan secondary data berupa literasi dan dokumen.
Teknik pengumpulan data meliputi: 1. Wawancara Mendalam (Deep Interview); 2.
Daftar Kuesioner berpedoman pada Indikasi, Peluang dan Dampak Risiko; 3.
Penggunaan Dokumen; dan 4. Studi Pustaka. Untuk teknik analisis data, penelitian ini
mengacu pada Manajemen Risiko 31000-2018.
Hasil Penelitian menunjukkan bahwa dari evaluasi risiko ditengarai ada beberapa
yang masuk kategori index 5 (very high risk) meliputi: 1. Risiko Material; 2. Risiko
Tenaga Kerja; 3. Financial; 4. Kondisi Alam; 5. Kondisi Sosial Ekonomi; 6.
Keselamatan Kerja; dan 7. Metode Produksi.
Keyword: Risk Management, ISO 31000. / The aims of this research are; 1. To get an idea of the risk opportunities faced by
red brick business actors in carrying out the production process; 2. To get an idea of
the impact of risks faced by red brick business actors in carrying out the production
process; and 3. To get an overview of risk management for red brick business actors in
carrying out the production process. Meanwhile, the problems of this research include:
1. What possible risks do red brick business actors face in carrying out the production
process; 2. What are the impacts of risks faced by red brick business actors in carrying
out the production process; and 3. What is the risk management for red brick business
actors in carrying out the production process;
This research uses a qualitative risk assessment method. The data source is
primary data through a questionnaire using in-depth interviews with key informants.
Also uses secondary data in the form of literacy and documents. Data collection
techniques include : 1. In- depth interviews ; 2. Questionnaire List based on Risk
Indications, Opportunities and Risk Impacts; 3. Use of Documents; and 4. Literature
Study. For data analysis techniques, this research refers to Risk Management 31000-
2018.
The research results show that from the risk evaluation it is suspected that there are
several that fall into index 5 ( Very high risk ) category incxluding: 1. Material risk; 2.
Labor Risk : 3. Fianancial ; 4. Natural Condition ; 5. Socioeconomic Conditions ; 6.
Work Safety ; and 7. Productin Method.
Keyword : Risk Managrment, ISO 31000