Abstract :
Treatment of factory waste, both solid and liquid, is part of an
environmental health effort. Waste management must be done properly. This is
done to create a healthy factory environment both within the factory itself and the
surrounding community. So that it will not cause a new problem with the
pollution caused by the waste.
From the results of the study the overall pool capacity is 90,564 m3 and the
volume of wastewater that enters at the beginning of the reservoir is 577.5 m3.
And it takes 2 hours for the waste water to flow into the first pond. After that the
water flows into each reservoir overflow and is held in the reservoir and
wastewater to make a natural overhaul with each predetermined time with a total
overhaul of total time is 138 days so that the levels of hazardous chemicals
contained in wastewater can be reduced and safe to be released into the river.
Liquid waste at the palm oil mill is also flowed to the application land in the
plantation.