ANALISA PENERAPAN KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK TOL KAPAL BETUNG SEKSI 1A Total View This Week0
Institusion
Universitas Muhammadiyah Palembang
Author
RHIYO YOGA PRATAMA, NIM. 112014027
Subject
teknik jalan raya
Datestamp
2020-07-13 01:41:58
Abstract :
The Toll Road Development Project is a construction project that has a high risk of work accidents. One reason is using heavy and sophisticated equipment that requires expertise to use properly.
The purpose of this study is to analyze SMK3 on the Kapal Betung Seksi 1A toll road development project. Analyzing the Implementation of Standard Operating Procedure (SOP) in the Kapal Betung Seksi 1A Toll Road construction project.
Based on the results of data processing that has been carried out for the evaluation of the application of SMK3 on the construction project of the Kapal Betung Seksi 1A toll road based on PP RI No: 50 of 2012 the final score of 89.93% is obtained so that the application of SMK3 is included in the category of very good