ANALISA KETERLAMBATAN PROYEK DENGAN MENGGUNAKAN METODE EARNED VALUE PADA PROYEK GEDUNG KECAMATAN KENDAL KABUPATEN KENDAL
Total View This Week0
Institusion
Universitas 17 Agustus 1945 Semarang
Author
., Ruswanto
Subject
HD28 Management. Industrial Management 
Datestamp
2025-03-13 06:28:55 
Abstract :
Consruction projects are a series of tasks carried out within a specific time frame, involving planning, execution, and optimization of limited resources. This research aimsto evaluate the time and cost performance, as well as estimate the cost and duration required to complete the construction of the Kendal District Office Building, Kendal Regency. From these two aspects, project control can be done using the earned Value Method. This study used data such as the Budget Plan (RAB), Project Time Schedule, Actual Project Time Schedule (from week 5 to week 8),and weekly Project Progress reports to calculate the values of BCWS, BCWP, and ACWP using the earned value method. ... 
Institution Info

Universitas 17 Agustus 1945 Semarang