Abstract :
Pt. Dock & Shipping Kodja Bahari Galangan III is a shipyard that has products and
services include 3 things, namely shipbuilding, ship repair, and non-ship. For
maximum achievement and high production, must be supported by good and
efficient resources and equipment. Likewise in shipbuilding. Many factors cause
production delays, including the condition of production equipment. Job safety in
the shipping world is also important and cannot be ignored. The safety of workers
and equipment operators is a factor that makes the maintenance of ship loading
equipment. To avoid major losses, production equipment must be carried out
planning and scheduling maintenance so as not to impact on financial losses for the
industry itself as well as the safety of workers or operators. The Company uses
preventive maintenance techniques so that scheduling maintenance or maintenance
on production equipment is carried out every 3 months to avoid large-scale damage
and financial losses for the company, but if a production tool has reached the limit
of the specified hour meter and damage has occurred according to the equipment
operator, then an unscheduled inspection is carried out at the time of repair on all
parts and units of the damaged equipment. Preventive maintenance is carried out,
the percentage of damage to small equipment occurs in production accidents so as
to ensure the safety of the operator of the tool.