DETAIL DOCUMENT
Tesis dengan Judul STUDI OPTIMALISASI SISTEM KETENAGALISTRIKAN DI BALI BILA TRANSMISI SUTET 500 kV JAWA – BALI CROSSING DIBANGUN
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Handayani, Oktaria
Sudibyo, Uno Bintang
Subject
Teknik Elektro 
Datestamp
2020-02-11 08:18:57 
Abstract :
ABSTRACT With the growth rate of electricity demand in Bali increasing ± 9% per year and in line with the vision and mission of the Bali government called Clean and Green, need a planning system to cope with the demand of electricity needs in Bali. One of the efforts of PT PLN (Persero) as a provider of electric power, according RUPTL 2013-2022 PT PLN (Persero) will build a 500 kV transmission Java - Bali Crossing which is planned to be completed by 2018. By using ETAP 7.0 simulation result is that the construction of the transmission 500 kV Java - Bali Crossing can be a solution to meet the electricity demand in Bali and can reduce the use of fuel generators with voltage value is still within the standard voltage value. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara