Abstract :
The supply of electricity has so far been generated from fossil fuel power plants, where the amount of fossil fuels in nature has always been reduced and cannot be renewed while electricity demand has always increased. One of the renewable energy sources available is wind energy which will not run out. One way of utilizing wind energy is to use Wind Turbine or wind power plants (PLTB). The design of PLTB development needs to pay attention to the potential of wind in the area, in designing PLTB for campus garden lighting lamps, the Institut Teknologi-PLN requires accurate calculations to be able to determine the optimal PLTB system. Factors calculated in the design are the potential power that can be generated, the number of loads per day and the number of wind turbines. From the results of this thesis calculation, the wind turbine power per day is 613.5734 Wd for a 480 Wh park lamp load 
Institution Info

Institut Teknologi Perusahaan Listrik Negara