A PHP Error was encountered

Severity: Warning

Message: fopen(/home/rama/public_html/application/cache/sessions/rama_sessionqgvd547kncd193qajh8fkf8jdt6e0bfj): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 174

Backtrace:

File: /home/rama/public_html/application/core/MY_Controller.php
Line: 8
Function: __construct

File: /home/rama/public_html/application/controllers/Document.php
Line: 6
Function: __construct

File: /home/rama/public_html/index.php
Line: 296
Function: require_once

RAMA - REPOSITORY
 DETAIL DOCUMENT
Kajian Pemanfaatan Energy Storage System (ESS) Sebagai Pengganti Pembangkit Listrik Tenaga Diesel (PLTD) Pada Saat Beban Puncak di Sistem Timor, NTT
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sabilla, Visty Nur
Januwarsono, Santoso
Makkulau, Andi
Subject
Teknik Elektro 
Datestamp
2022-10-13 08:45:24 
Abstract :
To substract the fossil energy depence is one of the efforts to resolve electrical energy crisis. The crisis happened because the fossil is limited, expensive, and unfriendly environment. The method used a quantitive method because it used calculations. While east Timor?s electric system is supplied by some generators, one of the largest power plant used there is Leasing Marine Vessel Power Plant (LMVPP) with 60 MW which is operated with the oil fuel. When the time peak load in Timor system (WBP) needs the additional generator which is sourced expensive cost which is generally from Diesel Plant (PLTD). The quality of the electrical energy supply system will increase as if it has integrated an ESS. The Energy Storage System (ESS) can fill the power requirement at peak load time (WBP). In this research the power of Energy Storage System (ESS) used by 10 MW on Peak Load Time (WBP) for 5 hours. The production cost for Energy Storage System (ESS) is Rp. 2.638,71/kWh, while the cost for PLTD is Rp. 3.498/kWh, that means there is difference cost using Energy Storage System (ESS) is 859,29/kWh. As in the Diesel Power Plant (PLTD) replaced with the Energy Storage System (ESS) then PLN saving potency can obtaine amount R0 20.520.000.000 each year. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara

A PHP Error was encountered

Severity: Warning

Message: Unknown: Failed to write session data (user). Please verify that the current setting of session.save_path is correct (/home/rama/public_html/application/cache/sessions)

Filename: Unknown

Line Number: 0

Backtrace: